The Beijing Subway excels in network size and ridership, while the London Underground offers a well-integrated system with a long history. The Dakar BRT provides a modern, sustainable solution for urban transport in Dakar. More information is needed on the New York City Subway to provide a fair comparison.
Metric | Beijing Subway | London Underground | New York City Subway | Dakar BRT (all-electric) |
---|---|---|---|---|
Price | ¥3 for a trip up to 6 km, with ¥1 added for the next 6 km, for every 10 km thereafter until 32 km, and for every 20 km beyond. Capital Airport Express: ¥25. Daxing Airport Express: ¥10 to ¥35 (ordinary), ¥50 (business) | £2.80-£2.90 (single ticket in central zones); £8.90-£16.30 (24-hour/one day ticket) | Not available | Zone-based fares set based on affordability surveys and existing fares |
Features | System Length: 879 km (546 mi), Number of Stations: 523, Daily Ridership: 9.46 million (2023 daily average), 13.75 million (July 12, 2019, record) | System Length: 402 km (250 mi), Number of Stations: 272 served (262 owned), Daily Ridership: 3.23 million (Average for 2023/24) | Number of Stations: 472 stations (as of April 1, 2025) | System Length: 18.3 km, Number of Stations: 23, Daily Ridership: 300,000 passengers |
Rating | overall: Not available, performance: Not available | overall: Not available, performance: Not available | overall: Not available, performance: Not available | overall: Not available, performance: Not available |